



WBB-1 boat is a commercial‑grade electric bumper boat built for parks, beaches, resorts, and family water parks.





The WBB-1 boat is a purpose‑built commercial water amusement solution for park lakes, beach resorts, family water parks, and tourist attractions. Every design choice – from the self‑draining floor to the UV‑stable LLDPE hull – targets lower maintenance costs, higher uptime, and a service life of 8+ years in outdoor conditions. We help buyers match the right configuration to their specific water environment and daily passenger volume
Industries We Serve
Municipal park lakes
Coastal beach resorts
4A/5A scenic water areas
Family‑oriented water play zones
Hotel & resort waterfront entertainment

Base Configuration
1. Imported polyethylene hull: high strength, high toughness, impact resistance, and guaranteed safety.
2. Antioxidant: German imported antioxidants and UV stabilizers, resistant to fading.
3. Self-draining: eliminates the hassle of operation and maintenance.
4. Extra-wide hull: more stable and safer.
5. Independently designed water gun, music, remote control, LCD display, remote start/stop, timer function, dynamic music, countdown reminder, etc.
6. 24V 500W brushless motor.
Upgrade Configuration
1. Two standard 12V 200AH lead-acid batteries
2. One high-power smart charger, providing 8 hours of battery life
3. Lighting
① Rapid Selection – 3 Questions, 30 Minutes
- Answer: “Water type (fresh/salt)?”, “Daily operating hours?”, “Expected riders/day?”
- Get a tailored configuration proposal within 30 minutes.
- Side‑by‑side comparison sheet with clear price/performance differences.
- Test boat available for bulk order prospects.
② Flexible Purchasing – Lower Entry Barrier
- MOQ:** 2 units – ideal for trial orders.
- Payment:** 30% deposit + 70% before shipment; instalments for frame‑agreement clients.
- Lead Time:** 15‑20 working days (standard), 25‑30 working days (custom).
- Packaging:** Steel frame + stretch film + waterproof cover, sea/land transport ready.
③ Reliable Delivery – No Shortages in Peak Season
- Monthly capacity: 80‑120 units (full production).
- Stock policy: 30‑50 units of popular models ready for urgent orders (ship within 7 days).
- Spare parts: Core components (motor, battery, controller) included in a free spare kit; 2‑hour quotation response for additional parts.
|
Parameter |
Specification |
|
Model |
WBB-1 |
|
Length × Width × Height |
302 × 220 × 190 cm |
|
Hull Material |
LLDPE (linear low-density polyethylene) |
|
Capacity |
4 persons |
|
Boat Weight |
165 kg |
|
Max Load |
450 kg |
|
Battery (Standard) |
12V 150AH |
|
Battery Upgrade |
2 × 200AH, 8–10h runtime |
|
Air Ring |
Thickened Plato clip mesh |

① Incoming Quality Control (IQC)
- LLDPE pellets: Melt‑flow index and UV8 additive content checked per batch.
- 304 stainless steel parts: Spectral analysis to confirm Ni≥8%, Cr≥18%.
- Batteries: Capacity, internal resistance, and short‑circuit protection tests.
- Motors: Insulation resistance and no‑load current tests.
② In‑Process Quality Control (IPQC)**
- Rotational‑moulding: Wall thickness uniformity (≥4mm standard) and porosity inspection.
- Air ring seams: 24‑hour pressure‑hold test (pressure drop ≤5%).
- Electrical system: Waterproof connector immersion test, controller function test.
- Self‑draining system: Simulated water ingress – drainage efficiency ≥95%.
③ Final Quality Control (FQC)
- Static check: Paint colour difference (ΔE≤1.5), torque verification on fasteners.
- Dynamic test: Each boat runs in water for ≥30 minutes – steering, acceleration, and water gun functions validated.

Packaging:PE stretch film + waterproof cover – fits 20’/40’ containers.
Shipping:Booking, customs clearance, and documentation assistance (EXW/FOB/CIF available).
Land transport:** Full truckload or LTL, door‑to‑door within China.
Spare parts:** Free wear‑part kit with each order; additional parts dispatched within 48 hour
50+ Scenic Spots Trust us – Repeat Orders Prove Performance
Real purchases from peers are the most reliable evidence. Below are representative cases from the past two years, covering different scales and environments.
Case 1 – 5A Scenic Lake, East China
Order: 24 units
Timeline:First delivery March 2024; repeat order +12 units April 2025
Reason for repeat:** 10‑hour daily peak operation – batteries met full‑day demand; self‑draining saved 2 manual labour positions.
Application:In‑park lake, ~300 riders/day.
Case 2 – Beach Resort, Southeast Asia
Order: 8 units
Timeline: Delivered September 2024, in continuous operation
Status: After 10 months in seawater, no rust; planning repeat order of 6 units in Q3 2026.
Application: Enclosed nearshore area for resort families.
Case 3 – Family Water Park, North China
Order:6 units in June 2024; added 4 units and upgraded all to YH‑210P in May 2025.
Repeat reason: Laser water guns increased average ride time from 10 to 25 minutes (+40% guest dwell time).
Application:Indoor‑outdoor combined water park.

Q1: What is the MOQ?
A1: 1 units for trial orders; frame‑agreement clients start at 6 units.
Q2: What is the standard lead time?
A2: 15‑20 working days (standard), 25‑30 working days (custom), from deposit confirmation.
Q3: Do you support OEM customisation?
A3: Yes – colours, logo silk‑screening, number of water guns, sound systems, lighting, etc. are all customizable.
Q4: What are the payment terms?
A4: Standard: 30% deposit + 70% before shipment. Frame agreements can negotiate instalments.
Q5: What is the warranty?
A5: Hull: 31years; motor: 1 year; battery: 6 months (excluding wear parts).
Q6: How is freight calculated?
A6: We offer FOB, CIF, and EXW quotations; provide freight estimates based on destination and quantity.
Q7: How to arrange charging stations?
A7: Recommended 1 smart charging cabinet per 4 boats (charges 4 battery sets simultaneously); can be ordered together.